Pungwe B Hydroelectric Power Station

Canal-2-2

Pungwe B Hydroelectric Power Station

  • Name – Pungwe B Hydroelectric Power Station
  • River – Pungwe River, Honde Valley
  • Installed capacity – 15 MW
  • Head  – 181 metres
  • Canal length – 2,300m
  • Canal flow rate – 12m3/s
  • Penstock size – 4 x 1,200mm diameter
  • Penstock length – 1,200m
  • Turbine design –  4 x Turgo turbines manufactured by Gilbert Gilkes & Gordon Ltd.