- Name – Pungwe A Hydroelectric Power Station
- River – Nyamombe river (tributary of the Pungwe river), Honde Valley
- Installed capacity – 2.7MW
- Head – 330 metres
- Penstock size – 900mm diameter
- Penstock length – 2,710 m
- Penstock flowrate – 1.3m3/s
- Turbine design – Pelton turbine manufactured by Gilbert Gilkes & Gordon Ltd.