- Name – Pungwe B Hydroelectric Power Station
- River – Pungwe River, Honde Valley
- Installed capacity – 15 MW
- Head – 181 metres
- Canal length – 2,300m
- Canal flow rate – 12m3/s
- Penstock size – 4 x 1,200mm diameter
- Penstock length – 1,200m
- Turbine design – 4 x Turgo turbines manufactured by Gilbert Gilkes & Gordon Ltd.